Requirements

Construction of RCC Retaining Wall Near RWY 23 in Operational Area at Diu Airport

Construction of RCC Retaining Wall Near RWY 23 in Operational Area at Diu Airport at an estimated cost of Rs. 2,14,68,146/- (Excluding G.S.T) with completion period of 08 (Eight) Months [including 02 (two) months considered for rains]. Tender processing fee of Rs. 1,180/- (i/c 18% GST) and Earnest Money Deposit (EMD...

Detailed Designing, Engineering, Procurement and Construction of Cityside works

Detailed Designing, Engineering, Procurement and Construction of Cityside works (New Domestic Terminal Building with parking, Electrical Sub-Station, Approach Roads, Ancillary Structures, Allied Works and Associated MEP and Electro-Mechanical works, Airport System, IT System, Security System including Maintenance, O...

Provision of Boom/Scissor Lift at Birsi Airport, Gondia

Provision of Boom/Scissor Lift at Birsi Airport, Gondia at an estimated cost of Rs. 1,54,56,411/- (Excluding GST) with completion period of 02 (Two) Months.  

Construction of Terminal Building, Residential Buildings, Multi-Level Car Park, Admin Building, and other Associated works at Patna Airport

Construction of Terminal Building, Residential Buildings, Multi-Level Car Park, Admin Building, and other Associated works at Patna Airport. SH: Replacement of floor tiles and other miscellaneous works at JPNI Airport, Patna. at an estimated cost of Rs. 3,18,50,400 /- (Without GST) with completion period of 02 Month...

Supply and Installation of vinyl sticker branding (on existing name board & direction boards) at 645 Ayushman Arogya Mandir in Himachal Pradesh

Supply and Installation of vinyl sticker branding (on existing name board & direction boards) at 645 Ayushman Arogya Mandir in Himachal Pradesh. Estimated Cost of the Item/Work is Rs. 15,57,838.98/- (Excl. GST). Bid Security/EMD is Rs. 39,000/-.  

Removal of Old Paint markings in Operational area at B.M. Airport, Ranchi

Removal of Old Paint markings in Operational area at B.M. Airport, Ranchi at an estimated cost of Rs.14,14,100.00 (Rupees Fourteen Lakhs Fourteen Thousand One Hundred Only) excluding GST with completion period of 02 (Two) months. Tender processing fee of Rs.1,180/- (i/c GST), Earnest Money Deposit (EMD) of Rs.42,423...

Renovation/Beautification of NITB Toilets at Tirupati Airport

Renovation/Beautification of NITB Toilets at Tirupati Airport. S.H.: Engineering / Architectural Consultancy services for Civil & Electrical Works at an estimated cost of Rs.18,93,760/- (Excluding GST) with completion period of 4 (Four) months including Nil months considered for rains. Tender processing fee is Rs...

Civil works during 2026-27 at Salem Airport

A/R & M/O Civil works during 2026-27 at Salem Airport Sub Head: Annual Maintenance Contract for Day to Day Maintenance and Minor Civil works at an estimated cost of Rs. 70.00 lakhs/- (excluding GST) with completion period of 12 (Twelve) months.  

Civil works in terminal building and operational/Non-Operational area at Diu Airport

Annual repair and maintenance contract of civil works in terminal building and operational/Non-Operational Area for the Year 2026-27 at Diu Airport at an estimated cost of Rs. 80.00 Lakhs (Excluding G.S.T) with completion period of 12 (Twelve) Months.    

Miscellaneous electrical works for operationalization of 1st Floor of SHA at civil airport, Jaisalmer

Miscellaneous electrical works for operationalization of 1st Floor of SHA at civil airport, Jaisalmer at an estimated cost of Rs. 39,13,288/- excluding GST with completion period of 04 months.  

SITC of Runway guard Lights and PAPI Units at Rajahmundry Airport

SITC of Runway Guard Lights and PAPI Units at Rajahmundry Airport at an estimated cost of  Rs 51,63,296/- (Fifty One  Lakhs  Sixty  Three  Thousand Two Hundred and Ninety  Six Only)  excluding  GST  with  completion period of  04 (Four) Months.   

Conceptualizing, designing, Fabrication/ Commissioning and management of AAI Pavilion at WINGS India - 2026 from 28th to 31st January, 2026 at Begumpet Airport, Hyderabad

Conceptualizing, designing, Fabrication/ Commissioning and management of AAI Pavilion at WINGS India - 2026 from 28th to 31st January, 2026 at Begumpet Airport, Hyderabad.