Requirements

Empanelment of Agencies for design, construction, supply, installation and commissioning of integrated resource recovery center for dry waste

Empanelment of Agencies for design, construction, supply, installation and commissioning of integrated resource recovery center for dry waste.  

Pillar and radial drilling machine

Siddhapura Engineering Works is bhavnagar based manufacturer of pillar drilling machine of varios capacity like 19mm to 40mm with belt driven, auto feed as wel as all geares drilling machine. The compnay alsomanufacturing of radial drilling machine of various capacities ranging 25mm to 60mm with belt driven, auto fe...

Design, Engineering, Procurement and Construction (EPC) basis Construction of 250 Bedded UG Boys Hostel at AIIMS Guwahati, Assam

Design, Engineering, Procurement and Construction (EPC) basis Construction of 250 Bedded UG Boys Hostel at AIIMS Guwahati, Assam.  

Empanelment of Business Associates in Implementing Mental Health Programs or Projects in Various States; Kerala

Empanelment of Business Associates in Implementing Mental Health Programs or Projects in Various States.  

Retender To Provide Manpower for Outsourcing of HouseKeeping Services on contract basis at HLL KFC

Retender To Provide Manpower for Outsourcing of HouseKeeping Services on contract basis at HLL KFC.  

Pipeline laying and associated works for last mile connectivity to M S Himadri Specialty Chemical Limited Singur in West Bengal

Pipeline laying and associated works for last mile connectivity to M S Himadri Specialty Chemical Limited Singur in West Bengal.  

Above ground GI installations including leftout last mile connectivity at consumer end at Jamshedpur GA

Above ground GI installations including leftout last mile connectivity at consumer end at Jamshedpur GA for CGD Project (01 Year ARC)  

Above ground GI installations including last mile connectivity at consumer end at Ranchi GA

Above ground GI installations including last mile connectivity at consumer end at Ranchi GA for CGD Project (01 Year ARC).  

Construction of 1st floor over existing station building at Divi Terminal and Refurbishment of Office Building at Kadi

Construction of 1st floor over existing station building at Divi Terminal and Refurbishment of Office Building at Kadi.  

Repair & maintenance of Civil Works at Meerut-RCS, Airport

Annual Rate Contract for repair & maintenance of Civil Works at Meerut-RCS, Airport for the year 2025-2026 & 2026-2027 at an estimated cost of Rs. 80,00,000/- excluding GST with completion period of 24 (Twenty-Four) months.  

Day to Day maintenance and repair works in Mugalivakkam, Porur and Kancheepuram at Chennai Airport

A/R & M/O Civil works during 2025-26. SH: Day to Day maintenance and repair works in Mugalivakkam, Porur and Kancheepuram at Chennai Airport at an estimated cost of Rs. 20.00 Lakhs (excluding GST) with period of completion 365 days (12 months).  

Provision of High Mast & associated electrical work for newly built GSE (Ground Support Equipment) area at B M Airport Ranchi

Provision of High Mast & associated electrical work for newly built GSE (Ground Support Equipment) area at B M Airport Ranchi, at an Estimated Cost of Rs. 27,23,701.00 (Excluding GST) with Completion Period of 04 (Four) Months.